Project Goal: In order for the southern regions of Kazakhstan to reduce their dependence on gas imported from Uzbekistan, the Republic of Kazakhstan decided to develop the Amangeldy Gas and Condensate Field, which is located in the Zhambyl Region in southern Kazakhstan. The current annual production of the field is 400 million cubic meters of natural gas and 33,000 tons of gas condensate.
Location: The Zhambyl Region in the Republic of Kazakhstan
Client: ZAO KazTransGas
Project Scope: Base and detailed design, including environmental impact report, supply of equipment, construction management, start-up and commissioning, guarantee testing. The design included process schematics, material balances, P&IDs, assembly drawings, control-metering-automation, electrical facilities, etc. As well, a complete set of working documentation was provided (construction, mechanical, control-metering-automation, electrical facilities, etc.).
Start and Completion Date: 2002 - 2003
BSI Industries, Inc.
630 Morrison Road, Suite 100
Gahanna, Ohio 43230
Tel: (614) 863-4787
Fax: (614) 863-6617