Project Goal: After the disintegration of the USSR, the post-Soviet republics started on the path to independent economic development. As a result of this, it became necessary to take account of the flow of natural resources between neighboring states, including natural gas supplied from Russia to Georgia and Armenia. BSI Industries, Inc. designed and prepared all technical documentation for the construction of the gas metering stations Gvileti and Krasnii Most, stations that would facilitate the metering of gas transported from Russia to the Caucuses.
Location: Border between Russia and Georgia and Georgia and Armenia
Client: Georgian National Gas Company
Project Scope: Base and detailed designs, including environmental impact report, process schematics, material balances, P&IDs, assembly drawings, equipment, control-metering-automation, electric facilities, etc. As well, a full set of working documentation was provided (construction, mechanical, control-metering-automation, electric, etc.).
Start and Completion Date:1999 - 2000
BSI Industries, Inc.
630 Morrison Road, Suite 100
Gahanna, Ohio 43230
Tel: (614) 863-4787
Fax: (614) 863-6617