Project Goal: In accordance with the development plan for the Khauzak and Shady gas fields of the Dengizkul Gas Deposit, regular gas production was scheduled to begin in the fourth quarter of 2007. Therefore, during the second stage of this Project and upon completion of design work, BSI Industries, Inc. completed procurement of the equipment needed for the development of the Khauzak Gas Field in accordance with the requirements of the Design Documentation that BSI completed in the first stage of the Project.
Location: The Bukhara Region in the Republic of Uzbekistan
Client: ZAO Globalstroy-Engineering
Project Scope: Procurement and supply of equipment to Uzbekistan under DDU terms and providing Field Assistance services for assembly and start-up of the Gas Gathering System and the Gas Treatment Unit of the Khauzak Gas Field. The supplied equipment included process equipment and materials, inter-site process piping, power supply systems, process automation control systems, and control buildings with associated technology, etc. Services included Field Assistance by BSI specialists during assembly work, testing of installed equipment and start-up operations.
Start and Completion Date: 2006 - 2007
BSI Industries, Inc.
630 Morrison Road, Suite 100
Gahanna, Ohio 43230
Tel: (614) 863-4787
Fax: (614) 863-6617